Projects2026-02-10T15:31:18-08:00

Architectural project support from initial inquiry to delivery

Vestis projects range from multi-family housing, commercial development, industrial spaces, to government buildings with our specialized line of canopies, sunshades, and balcony systems.

“Really good service. The price is affordable, especially to me. In the beginning I was skeptic about the service, but I see that the guys are reliable and serious. Good quality and fair price as I said already. Well done job.”

Mae Ciast,

– Spokane, WA

Check out some of
Vestis recent projects

Vestis manufactures and delivers awnings, canopies, louvered sunshades, and bolt-on-balconies for any type of building. Here are some of our recent highlighted projects across the United States and Canada.

10,000+ architectural
projects completed across the US

The image shows a map of the United States highlighting locations of Vestis architectural projects completed across multiple states.

Count on Vestis
for your project every time

We understand how much your project matters, and our lean-manufacturing process gives us the ability to produce architectural systems quickly and with the quality your project deserves. Here’s a quick preview of a typical Vestis project flow.

The image shows a Vestis project timeline outlining architectural project support from initial inquiry through design, fabrication, and delivery.
The product quality exceeded our expectations; the balconies were well-built, durable, and had a clean, professional finish. Installation was straightforward and efficient.
James Molloy, Jetton General Construction

Learn more about our process
and reach out todays

Share the details of your project needs and we’ll walk you through how Vestis can support your specific requirements.

Franchisee finds perfect
canopy design with Vestis

Helped high-end retailer improve their curb appeal with a black powder coated louvered sunshade.

Product Used:

Date:

September 29th, 2020

Location:

Spokane, WA

The image shows the APEX Cannagear flagship store with Vestis louvered aluminum sunshades installed above the storefront as part of architectural projects.
The image shows a side perspective of Vestis louvered sunshades mounted above the entrance of the APEX Cannagear flagship retail building.
The image shows the entrance of the APEX Cannagear flagship store with Vestis aluminum louvered sunshades installed above the doorway.

Vestis product versatility
works with all project types

New Construction

Development

Renovation

Rehabilitation

Finish Out

We support any building type

Support at every service level

Vestis supports each stage of your project. Because of our modular design and lean-manufacturing process, we can assist with your project at any stage. From the estimator to the installer we have experience working in every aspect of the project.

Contractors

Vestis delivers prefabricated systems that cut field time and reduce risk. Pre-drilled, code-compliant, and engineered for fast installation when you need install-ready assets.

Commercial developers

Building a larger project or still planning? Vestis supports scalable, long-term builds with aluminum systems for multi-family, retail, and mixed-use projects.

Architects

Precision-engineered solutions that respect design intent, speed approvals, and meet safety codes.

Business owners

Stylish canopies and sunshades at entrances and windows that elevates curb appeal, supports branding, and enhances customer experience.

Frequently asked questions

We work with Architects and General Contractors to provide superior architectural products for all of their commercial project needs, including multi-family, apartments, mix-use, restaurants, and retail.

What types of projects does Vestis work on?2026-01-15T09:19:14-08:00

Vestis MFG primarily works on commercial and multi-family construction projects. Our focus is on high-efficiency, prefabricated architectural elements that can be “bolted on” to a building quickly, which appeals to developers looking to save time and labor costs.

What products does Vestis deliver?2026-01-15T09:19:29-08:00

Vestis MFG produces and delivers a specific line of prefabricated aluminum architectural products. Our business model focuses on “turnkey” solutions that are manufactured in our Spokane facility and shipped as complete units for fast on-site installation.

What is the average project duration?2026-01-15T09:19:42-08:00

The average lead time for most projects is 8 – 12 weeks from submittal approval.

What is the timeline for the delivery of a project?2026-01-15T09:19:53-08:00

The average lead time for most projects is 8 – 12 weeks from submittal approval.

The image shows a commercial building facade with Vestis louvered architectural sunshade systems mounted above the windows and entry area.

Need a quote on a project today?

Reach out to our project engineers for a rapid quote customized to your project’s needs. No matter where your project lifecycle is at, our team can help you out.

    “Vestis exceeded expectations with their professionalism and attention to detail. The balcony installation was flawless, completed ahead of schedule, and fully compliant with all building codes. Their project management and communication throughout the process was outstanding.”
    Dylan Ragland, D&T Welding
    Go to Top